    Renovating a home can be a huge task, but it does not have to be. This blog post will give you the sequence in which to do various home improvement projects.

    Where Should You Begin When Renovating Your Home?

    It might be challenging to determine how to get started on a renovation job. It's important to figure out if a renovation job is even feasible for you to begin with. You need to know exactly what you want out of your remodel if that's the case, and you can only do that if you're familiar with the space you'll be working with.

    What Is The Age Of My House?

    Knowing the age of your home can be determined in a few simple steps. To get the greatest results from your renovation, it is helpful to have some background knowledge of your house before you start working on it.

    How Should I Begin My Renovation?

    When beginning a home improvement project, it is essential to initially have open lines of communication and educate oneself. Never begin a renovation without first consulting with professionals like builders and architects, as well as the local planning authorities to secure the necessary permits and to outline the goals you hope to achieve with the work.

    How Do I Plan A Home Improvement Project?

    If you want your home improvement project to go smoothly, give yourself plenty of time to think through your alternatives. The next step is to consult with multiple contractors before selecting the best one. Once you've hired a contractor, it's necessary to create a detailed timeline of events so that everyone can stay on the same page.

    Step-by-Step Guide To House Renovation

    What Order Do You Renovate A House

    The key is to zero in on the ideal remodelling job. In order to begin a home improvement project, you must first acquire a dwelling to work on. However, it is not always simple to locate a suitable house for remodelling. In addition to finding a house that will serve your needs once renovations are finished, you should look for one that will allow you to turn a profit when user decide to sell. However, this doesn't always equate to good value, especially if the home is located on a street with a price cap. There are a few universal rules to follow when scouting for a renovation project's target property:

    • Check out any additions or other work that the houses around you have had done.
    • Do you have enough room in the backyard and on the sides for an addition?
    • Examine the most recent selling prices just on road and any improvements made to the properties on that road to determine if there is a ceiling price on the road.
    • Get a survey done just on property you're interested in to make sure there aren't any big concerns like subsidence, damp, or drainage that might end up costing you a lot of money.
    • Get a building report to find out what kind of building materials were used in the house because you can design your renovations accordingly.
    • In order to apply for a building permit, you will need detailed drawings of property's layout, which can be obtained through a measured survey.

    Create A Strategy

    Make a list of everything you think needs to be done before you begin working on the property. We recommend taking some time to "think" because, at this point, you likely won't be certain and new information or angles may arise. Having a plan will help you remember everything that needs to be done and will make it clear which of the items listed below apply to your home. Get initiated as soon if any of the work requires planning clearance; the process can take months.

    Repair Any Structural Flaws.

    Ask a structural engineer to have a look at any exterior cracks in the building. As quickly as possible, have them fixed if the damage is more than skin deep. This is an absolute must for beginning any kind of renovation on the property, inside or out. Nobody likes being on the clock in a building that could collapse at any moment.

    Verify That The Property Is Watertight.

    Make sure that roof is in good shape and not leaking before you start working on the inside. The most significant threat comes from water seepage. Until you know for sure that further damage cannot be done, there is no use in working on the inside of it.

    Look for damaged or missing tiles, as well as any structural problems, on the roof.

    Replace any cracked or missing glass in the windows. There's no rush to replace the glass, but you should definitely board it up for security.

    Remove Everything

    If you plan on making major changes, it's best to start from scratch. One benefit is that it might unearth issues like decaying joists or other signs of water damage that could otherwise go undetected. You might think of it as a clean slate upon which to build. Once you have removed all of the contents, it will be much simpler to perform individual tasks like installing new wiring or installing central heating.

    Repair Any Leaks.

    Assuming you've gotten rid of everything, you should be able to see any issues with the structure. This may involve things like rotten joists, sagging floors, and pools of water. Determine the source of the moisture or decay. A leaky suction hose or a clogged air brick could be the cause of this problem. Repair the underlying issue before attempting to repair the resulting damage. Once you've eliminated the root of the problem, you may move forwards with fixing the damage without worrying about it coming back.

    Reorganise The Space

    Now is a good moment to alter the property's layout if that is something you have been thinking about. Whether you are merely extending your current space by adding or knocking down a wall, this holds true. To make sure a wall you want to knock down is not supporting any loads, have a structural engineer look it over first. 

    Inspect The Garden Access

    This is especially true if you need to go inside the home to get to the backyard. Such a layout is typical of houses built on terraces. You don't want to spend time and effort making your house appear nice only to realise that need to move some muck from the backyard, perhaps ruining your hard work. If fixing up the interior of the house means you'll have to go through it to reach the backyard, you should take care of the garden first. You can put this off till last if you like, provided the house has convenient rear yard access.

    Electrical And Plumbing Upgrades

    Electrical and plumbing systems should be installed after the building's layout has been finalised and any obvious problems have been addressed. At the very least, the electrical work in most older buildings needs to be brought up to modern standards. In case you need more plugs or switches, now is a good time to have them put in. The plumbing system of a property undergoing restoration often requires attention, such as the installation of a new boiler or the setting up of central heating. Hurry up and get this done, but only if you can get a competent professional.

    Repaint The Walls

    The ceilings and walls can be re-plastered and painted once you've verified that the electrical work work is finished and up to code.

    Redecorate

    It's now time for the finishing touch of the renovation: new paint and furnishings! Bathrooms and kitchens typically require the most effort, and since you'll be moving things like sinks and cabinets about the house, you won't want the new paint to get scratched up. The rooms farthest from the entrance should be your first priority. As a result, you won't have to constantly passing past rooms that have just been re-decorated. First, paint the walls and ceilings, and then instal any new doors and skirting that will be needed for the room. Putting in the flooring last will guarantee a flawless final product.

    Is Planning Permission Required?

    Renovation Vs Remodeling (3)

    Renovations that include substantial construction may require special permits. It's important to figure out early on if this is necessary because it can delay the renovation process. Do you, then, need a special permit from the city?

    Most likely, you won't require planning approval if your proposed work does not alter the visible footprint of the property in any way. Any construction work or electrical installations will, however, require authorisation from building regulations. Common allowed development projects include:

    • Expansions that add only one level
    • Making the Most of Your Attic Space with a Conversion to a Loft
    • Conservatories
    • Porches
    • Decking
    • Construction of a Basement
    • Parking

    Nonetheless, it is best always to check with the local government to see if you require planning approval for the work that wish to conduct.

    Decide What Will Stay And What Will Go.

    Large-scale renovation projects often lead homeowners to make the mistake of reducing their homes to their barest essentials. A property that has been stripped down to its shell can be renovated to the owner's exact specifications, but doing so comes at a higher cost and eliminates the possibility of reusing any of the building's original features.

    Before beginning any major renovations, give some thought to the existing characteristics of your house and how they might fit into your ideas. Keeping some items around can help you save cash and may even assist maintain the property's original charm. Review the following and decide if you want to keep them:

    • Doors
    • Windows
    • Fireplaces
    • Accents like coving are purely decorative.
    • Beams

    Example Of A Work Schedule

    House renovations call for a strict timetable of tasks to be completed. What you have here is a comprehensive, chronological list of all the tasks involved in your renovation. A schedule of works, while working with the a builder and contractor on the a home remodeling, also serves as a weakly legal contract between you, your homeowner, as well as the person executing the work, allowing you to keep things on track and under budget. An example schedule for works for a sizable renovation project is as follows:

    External Work

    • Consistency in brickwork and pointing
    • Exterior rendering and painting
    • It is time to clean, fix, and replace the roof tiles.
    • Make necessary repairs to the chimney.
    • Front elevation render repairs
    • Substitute 4 Windows on the Main Facade
    • Side elevation render has been thoroughly cleaned.
    • Rearrange furniture to make room for new frosted window on side elevation
    • Do away with soaring flora in the background.
    • Four windows on the rear elevation need to be replaced.
    • Put in French doors in place of the sliding ones in the ground-level kitchen.

    Internal Work

    • Do away with the carpeting on the first level and instal the wood flooring that has been provided instead.
    • Take out the kitchen and the wall that connects it to the dining room on the inside.
    • Take out the old radiators and put in the new wrought-iron versions.
    • Put in a brand-new kitchen and appliances
    • Take down the old mantel and repair the plaster wall.
    • You should get rid of the carpeting on the main floor.
    • Take down the wall separating rooms 4 and 5, then drywall and plaster the opening.
    • Take out the first-floor lavatory, flooring, and tiles.
    • Renovate the bathroom by installing new flooring, tiles, and a new sink, bathtub, and
    • Take down the old entry door and put in the new composite one.
    • Get rid of it all and throw it away.
    • Replace the old gravel driveway with a resin one.

    Your Property's Access

    Extremely heavy machinery is needed for major renovations. You and your builder and contractor should discuss access to the property and the means by which heavy equipment will be brought to the site before beginning any work. You might also need to consult with the locals if the machinery needs to gain access over their property or if the work will have any sort of effect on their lives.

    Work Has Begun

    At this point, your home improvement schedule will become indispensable. After your home has been gutted in preparation for renovations or an addition, the construction team will move onto "first fix" phase of the project. Among these are:

    • Altering the layout of an interior space by modifying the number of walls
    • Putting up door trim
    • Setting up new levels
    • Including sash and panes
    • Installing plumbing components like drains and soil pipes
    • Installing piping, alarms, and electrical wiring for features like thermostats that will be concealed under drywall.
    • After the first fix phase is finished, the plastering may begin and the floor screed can be laid.

    Next, we'll look at second-round repair tasks like:

    • Incorporating electrical features like switches, plugs, and outlets
    • Installation of architraves and doors
    • Put in new fixtures for the kitchen and bathroom
    • Putting in place the necessary radiators, boilers, and controls
    • Constructing a Kitchen
    • Concealing any uncovered piping by enclosing it in a box and coating it

    Snagging

    It's not surprising that after extensive renovations your home needs some time to rest and recuperate if you conceive of it as major surgery. During that time, a number of issues can arise, including:

    • The flaking of freshly plastered walls
    • The Minor Leaks
    • Difficulties with the heating system
    • Wear and tear for aesthetic effect

    After house has settled after a few months or months, your builder should return to fix any snagging issues at no extra charge.

    Your Renovation Concerns Addressed

    How should we prioritise our home improvements? It's crucial to think carefully about the manner in which you perform tasks when remodelling your home. In most cases, the following is the typical order of operations during a renovation:

    • Disassemble and take apart
    • Building components like partitions and joists
    • Maintenance appointment #1: plumbing, heating, and wiring
    • Finishing touches on the walls and floors
    • Work on the plumbing, heating, and electrical systems as a second fix
    • Renovating a bathroom or kitchen
    • Decoration

    If You're Doing Your Own Renovation...

    If your remodelling plans are minor or largely cosmetic (such painting, tiling, or flooring), you may want to take them on by yourself. If that's the case, your strategy should be determined by how well you can adjust to daily life during the construction phase. If you want to get the most out of your renovation time, it's best to break the job up into manageable chunks, pick a starting point that works with you, and then go on to the rooms that are immediately adjacent or connected to it.

    In addition, it's recommended that you get started with the room that is most important to you, which for most people is the kitchen. In this way, if resources are exhausted, the most important part will have been completed. Because of this, the decision of where to begin is deeply personal, but it's also the one that will provide you the most fulfilment in the long run. Not convinced yet? start with the room that needs fixing first, and afterwards move on to the aesthetic upgrades. Another way to look at it is to knock out the tougher tasks first. It's best to get the messy stuff out of the way first since the results will be immediately apparent and the sense of accomplishment will encourage you to keep on going.

    If You're Hiring An Expert...

    Your order will normally be determined by specialists that have to go in and manage them if the renovation is more extended and demands expert assistance. For instance, it is not uncommon for plumbing and electrical repair to need to be completed at the same time. A inside-out strategy is a safe bet if your staff asks for your input on the matter.

    In other words, you should start on the inside (with things like the technical aspects of the walls and floors) and work your way to the outside (think cosmetic finishes). With larger, multi-trade projects, it's usually best to hire a professional team because they'll have a better idea of how to get things rolling. You won't have to spend as much time as necessary residing in a makeshift renovation workstation if you hire professionals to speed up the process.

    Don't Make the Wrong Decision.

    Failing to complete tasks in the proper sequence might have severe consequences (another reason why hiring a professional team is critical). You might also waste time and money fixing it (especially if your mistakes involve paint or flooring stains). In addition, bigger accidents can necessitate an expert's presence nonetheless. If you approach the task in a methodical manner, you will save time and money while producing more polished and streamlined final outcomes.

    Conclusion

    Renovating a house can seem like an overwhelming process, but it doesn't have to be. The steps for completing various renovations are outlined in this section. Never start a renovation project without first discussing it with skilled tradespeople. Once a contractor has been hired, a comprehensive schedule must be developed. Finding a house in need of renovation might be challenging. When searching for a home to use as the basis for a makeover, there are a few guidelines that should be adhered to. Having a plan will help you keep track of everything that needs doing around the house, and it will make it obvious which of the following points are relevant to you.

    Content Summary

    1. Renovating a house can seem like an overwhelming process, but it doesn't have to be.
    2. The steps for completing various renovations are outlined in this section.
    3. If you're not sure where to begin with a renovation project, that's okay.
    4. Consider whether or not you have the resources to complete the renovation project.
    5. On that scenario, you need to be well-versed in the area you plan to renovate so that you may make informed decisions.
    6. It only takes a few easy steps to figure out how old your house is.
    7. Before beginning your remodelling, it is helpful to have a basic understanding of your home and its systems.
    8. Open communication and self-education are the first steps in any home remodelling endeavour.
    9. Give yourself plenty of time to consider your options before beginning your home renovation project.
    10. After that, it's time to start talking to various contractors about your needs.
    11. Once you've selected a contractor to handle your project, you'll need to draw up a comprehensive schedule to ensure that everyone knows what's going on.
    12. A successful renovation project relies on careful planning.
    13. Getting a house to do work on is the first step in every home improvement project.
    14. Locating a house that is ideal for renovation is not always easy, though.
    15. When searching for the ideal location for a renovation project, there are a few guidelines that should always be adhered to: Check out the renovations and improvements that your neighbours have added to their homes.
    16. Find out what kind of construction materials were used in the property by ordering a building report. This will help guide your remodelling plans.
    17. Accurate blueprints of the land's plan are required for a construction permit application, and they can be obtained from a measured survey.
    18. Strategize Your Way To Success Get started on the property only after you've made a list of everything that needs doing.
    19. Fix all the cracks in the structure.
    20. Any time you see a fracture in the building's facade, it's a good idea to have a structural engineer take a look.

    Frequently Asked Questions About Renovate A House

    To begin with, the repairs in your first-priority room move on to the cosmetic changes after they are completed. Alternatively, think of it this way: Get the more intense projects out of the way first.

    1. Put A Plan In Place. 
    2. Fix Any Structural Problems. 
    3. Make Sure The Property Is Watertight. 
    4. Strip Everything Back. 
    5. Fix Any Damp Issues. 
    6. Reconfigure The Space.
    7. Check The Garden Access. 
    8. Update Electrics & Plumbing.

    Do your kitchen first. A kitchen remodels yields about a 70 per cent return on investment typically. And we all know a great kitchen can help sell a house. So from a smart renovation, in case you want to turn around and sell perspective, doing your kitchen first makes sense.

    Do all of the foundational and exterior work first. It's natural to want to move on to the next project phase, but ensure the house is sound before you begin interior work. That means replacing windows and putting on a new roof if needed.

    1. Assess the Old House. 
    2. Research History. 
    3. Vision and Plan. 
    4. Consult an Architect. 
    5. Structural Issues and Repairs.
    6. Restore Period Features. 
    7. Plumbing and Electrical Updates. 
    8. Fix the Walls and Redo the Floors.